| Seg. # |
|
Segment Location | Needed to Complete: | Work to Start*: | Completion Date**: |
| 1 |
|
US 220 from Virginia Border to NC 68 | Upgrade Highway to Interstate Standards | After 2015 |
|
| 2 |
|
US 220 from NC 68 to near NC 150 | Upgrade 2 Lane Roadway to Interstate Standard Freeway | 2010 |
|
| 3 |
|
NC 68-US 220 Connector | Construct
New
Freeway |
2013 |
|
| 4* |
|
Bryan Blvd from NC 68 to Greensboro Urban Loop | Build
and Upgrade Roadway to Interstate Standards |
-- |
by 2009 |
| 5* |
|
Greensboro Urban Loop from Bryan Blvd. to US 220*** | Completed |
-- |
|
| 6 |
|
US 220, from I-40/85 to US 311 |
Upgrade to Interstate Standards**** | After 2015 |
|
| 7 |
|
US 220, from US 311 to North of SR 1364, Asheboro | Upgrade to
Interstate Standards**** |
After 2015 |
|
| 8* |
|
US 220 from North of SR 1364 in Asheboro to South of NC 134/Business 220, Ulah | Upgrade to Interstate Standards |
|
|
| 9 |
|
US
220 from US 220 Business, Ulah to US 220A near Emery |
Complete1 |
|
|
| 10* |
|
US 220 Ellerbe Bypass, from US 220A near Emery to South of Ellerbe | Complete |
--
|
|
| 11 |
|
US 220, Rockingham Bypass, from Ellerbe to US 74 | Construct New Freeway | After 2015 |
|
| 12 |
|
US 74 from US 220 Rockingham Bypass to near NC 38 exit | Complete |
|
November 2000 |
| 13* |
-- |
NC 38 exit from US 74
Rockingham Bypass to SC State Line |
Construct New Freeway |
2009? |
--
|
* Recently
Updated with New Information
Color Key:
Complete, Under Construction, Funded Future Project, Unfunded Future Project, Not Listed in Current STIP
* Dates
from NCDOT's Draft State Transportation Improvement Program (STIP)
2009-2015 (November 2007) and are subject to change. Projects
not included in the STIP have an assumed starting date after 2015.
** For
completed and under construction projects only.
***
Construction of the Greensboro Loop is not
specifically an I-73 project, for it will
initially be signed I-40 or I-840. I-73 is to be routed upon it,
however, when projects north of Greensboro are completed .
**** While the project to upgrade I-73 is
unfunded and not set to start until after 2015, NCDOT hopes
to get a waiver to have these segments signed as a full interstate
when the Asheboro construction project is completed.
1. Though the road is signed as I-73/74
work is still needed on widening the shoulders on part of it to
meet interstate standards, this project should start in 2011.
I-73
and Future I-73 shields courtesy of David R. Kendrick's Shield's
Up! .