North Carolina Exit List| Current Highway
Signed As: |
Mile |
(Scroll Down) |
(Scroll Up) |
|
|
|
|
|
|
|
|
East Lumberton |
|
| 4 5
|
I-73 joins US 74 Rockingham
Bypass from NC 38 Corridor from SC Border |
I-73 leaves US 74 Rockingham
Bypass along NC 38 Corridor to SC Border |
|
f
|
|
Hamlet Richmond Comm College |
|
f
|
|
Rockingham Southern Pines Cheraw To
Ellerbe Asheboro
Greensboro |
|
|
|
|
West Monroe Charlotte |
|
|
|
|
onto Planned US 220 Bypass Freeway to current US 220 |
onto Planned US 220 Bypass to US 74 Bypass |
22 |
|
||
| Begin Freeway |
End Freeway |
||
|
|
EXIT 8
Business
Ellerbe
|
|
|
|
EXIT 11
Millstone Rd (To NC 73 West)
Ellerbe
REST AREA |
|
|
30 |
EXIT 13 Haywood Parker Rd |
|
|
33
|
EXIT 16
|
|
|
35 |
EXIT 18
Norman |
|
|
|
|
Enter Richmond
County
|
Enter Montgomery County |
|
|
EXIT 22
Tabernacle Church Rd |
|
|
41
|
EXIT 24
Candor
|
|
|
|
Begin
|
End
|
|
|
Candor Pinehurst |
|
|
|
(Exit 33)
Biscoe [Troy Carthage] |
|
|
|
Star Robbins |
|
|
|
EXIT 39
Ester Steed |
|
|
|
EXIT 42
Black Ankle Road |
|
|
|
|
Enter Randolph
County
|
Enter Montgomery County |
| 60 |
Rest Area (Visitors Center) Opening 12/09 |
Rest Area (Visitors Center) Opening 12/09 |
|
|
62
|
EXIT 45
Seagrove [Robbins] |
|
|
|
EXIT 49 New Hope Church Rd |
|
|
68 |
EXIT 51
Bus.
Ulah Troy |
|
| End I-73/74, Begin Future
I-73/74 |
End Future I-73/74, Begin
I-73/74 |
||
|
72 |
(Exit
55) McDowell Road Randolph Community College |
|
|
73 |
(Exit 56A)
East North
[Siler City] Raleigh |
|
|
73 |
(Exit 56B)
West
South
Charlotte |
|
|
|
(Exit 58)
Asheboro Left Exit |
|
|
|
(Exit 59A)
Presnell Drive |
|
|
|
(Exit 59B)
To Business
Fayetteville St [Vision Drive] |
|
|
|
(Exit 61)
Spero Road
|
|
|
|
(Exit 62)***
Pineview Street
|
|
|
|
WestHigh Point Winston-Salem |
||
|
|
High Point |
|
|
|
(Exit
67) Randleman [Richard Petty Museum] |
|
|
88 |
(Exit 71)
Business
Level Cross |
|
| 89 |
Enter Guilford County |
Enter Randolph
County
|
|
|
|
|
|
|
94 |
EXIT
77 Old Randleman Road |
|
|
95
|
EXIT
78A
North
South To
EastDurham Raleigh |
|
|
95 |
EXIT 78B
North Winston-Salem To Groometown Rd (I-73 currently uses 220 exit numbers, so exits off of itself. Access to I-85 South using Bus. 85) |
EXIT
95
SouthAsheboro |
| 95 |
(Exit 95B)
North to
Greensboro |
(Exit 95)
North
SouthDurham Sanford |
|
|
|
|
North I-73 Begins on I-85 C/D Ramp and
joins US 421 North after Exit 121A on Greensboro Urban Loop |
I-73 leaves US 421 South and Ends.
Future I-73 continues onto US 220 South |
|
97 |
Exit 121A Groometown Road |
EXIT 97A
South
WestHigh Point Charlotte |
|
97
|
EXIT 97B
North
EastGreensboro |
|
| 98 |
High Point Rd
(Exit to be constructed later) |
||
|
102 |
EXIT
102 Wendover Ave |
|
|
103 |
EXIT 103A
EastGreensboro |
|
|
103 |
EXIT
103B
NorthWinston-Salem |
EXIT 1
NorthGreensboro
Winston-Salem |
| End North I-73, Begin
Future I-73/I-840. Through Traffic follows sign: "TO Bryan Blvd/PTIAirport" |
Begin South I-73
after Exit 1, join US 421 South, End Future I-73/I-840 |
||
Future
|
104 |
EXIT
2 W. Friendly Avenue |
|
Future
|
105 |
EXIT
3 Bryan Blvd PTI Airport [All Traffic Exit] |
|
|
|
I-73 Leaves I-840
Greensboro Loop and Joins Bryan Boulevard
|
I-73 Leaves Bryan
Blvd. and Joins I-840 Greensboro Loop
|
|
|
Bryan Blvd.
|
107 |
Piedmont-Triad International Airport |
|
| 108 |
I-73 Leaves
Bryan Blvd for 'NC 68 Connector' |
I-73 Leaves
'NC 68 Connector' for
Bryan Blvd. |
|
109 |
To
High Point
South |
||
|
|
110
|
* to
WestWinston-Salem TOLL ROAD |
|
|
|
110 |
I-73 joins existing
NC 68 Expressway from 'NC 68 Connector' |
I-73 leaves NC 68 Expressway
and joins 'NC 68 Connector' |
|
|
111
|
NorthStokesdale |
|
|
|
110 |
I-73 leaves
NC 68 and joins NC 68 - US 220 Connector |
I-73 joins NC 68 and leaves
NC 68- US 220 Connector |
116 |
Summerfield Kernersville |
||
| 116 |
I-73 leaves NC 68- US 220 Connector
and
joins US 220 |
I-73 leaves US 220 and joins NC 68 - US 220 Connector |
|
|
|
118 |
SouthSummerfield Greensboro |
|
|
120 |
Reidsville
Winston-Salem |
|
| 121 |
Enter Rockingham County |
Enter Guilford County |
|
|
123 |
To
Stokesdale |
|
|
129 |
Business
(
South)Madison |
|
| SPEED LIMIT
60 |
SPEED LIMIT
55 |
||
|
132 |
(
Mayodan
North)
Eden |
|
|
134 |
Business
Madison Stoneville |
|
|
135 |
Stoneville Eden |
|
|
137 |
Smith Rd |
|
140 |
|
|
|
*This is a List
of Exits on Freeways along I-73's proposed route,
using information gathered from roadtrips along the I-73
corridor. Exit signage assumes I-73 is built as planned and
current exits along existing freeways will not change after
the roadways are upgraded to an Interstate. I-73 mileage is
for potential future exit numbers when I-73 is signed along existing
routes; numbers based on difference between existing exit numbers,
map calculations and, for proposed construction project sections,
mileage listed in the NCDOT 2009-2015 STIP. I have also used
mileage presented in the new NCDOT Strategic Highway Corridors website,
where it did not conflict with my own records. Most speculative
exit locations not official.
**( )Indicates no Exit Number
signed, assumed exit number based on mileage from
previous numbered exit(s).
***Existing exit numbers use
US 220 mileposts which do not apparently include the increased
mileage for the proposed Rockingham Bypass (the mileage
would have to adjusted upward by about 8 miles). For I-73
Mileposts, the number would increase by 17 miles.
*I-273 is my proposed designation for
the planned 'I-73-74 Connector' being studied by the NC Turnpike
Authority that would run from the end of Bryan Boulevard to the
I-74 Winston-Salem Northern Beltway. It would include a spur connecting
to I-40 near the current I-40, Business 40 split east of Winston-Salem. For more, go HERE.
f-May be signed
Future I-73 in near future
Route Shields
courtesy of David
R. Kendrick's Shield's Up!. Business 40 shield courtesy of
www.steveriner.com/nmhighways/us-interstates.htm
|
|
|
Created: July 25,
2006.
Last Updated:
August 2, 2009.